Showing posts with label rain. Show all posts
Showing posts with label rain. Show all posts

Monday, July 25, 2011

To much of a good thing

disease issues on 7 fairway
My last few posts have focused around all the rain that Mother Nature has been supplying the golf course, but we have had to much of a good thing.  Our fairways are suffering from the effects of to much water and extreme heat and humidity.  Our issues began when there a was standing water on the golf course from the 5" of rain we received two weeks ago, and then the air temperatures soared to around 100 degrees. The high temperature in effect caused the standing water to get hot enough to overheat and kill the turf.  Then once the humidity began to rise from our normal 15 percent to the upper 60's the disease issues began to emerge.
disease pressure in 10 approach
We are doing everything possible to get these dead areas in the fairways back, from spiking to increase air and water movement, to overseeding with ryegrass to help fill in the areas as quickly as possible.  As long as Mother nature cooperates for the next couple of weeks we should see a full recovery just in time for some great late summer golf.

Tuesday, July 12, 2011

The dreaded afternoon thumderstorm

Storm that dropped 1.25" of rain on the course
Over the past week we have had heavy rains hit the golf course every afternoon. 0.6" of rain fell Wednesday night, followed by 0.64" Thursday, 1.25" Friday, 0.26" Saturday, 0.36"Sunday, and 0.28" Monday night. 
18 greenside bunkers washed out after 1.25" rain
18 greenside bunkers after repair
The crew has had to repair bunker washouts every day for the last 6 days. This is a long and very physically demanding process that consists of pushing the washed out sand from the bottom of the bunker back onto the face of the bunker. Then the crew works on proper sand depth and compaction. The final step is to hand rakes all the edges and spin the bunker to smooth out the plow marks. The average bunker will take about 30 minutes to fix with two workers, with 68 bunkers, the process can take about 70 man hours to complete. Having to do this 6 times in the last 6 days has been tough on the maintenance crew (420 hours). If you happen to see anyone from the maintenance staff on the course please make sure to thank them for all of there hard work to keep the bunkers in playable condition this last week.

Thursday, May 19, 2011

Rain, Rain, and more Rain!

15 cart path under water
 One thing you will learn about this blog is a Superintendent is never happy with the weather, if the sun is out  we are complaining about how long it has been since we have had a good soaking rain.  When it rains, we will complain that the course is getting to much water, and it needs to dry out.  But this year has been to the extreme, after going 93 days this spring with no measurable rain fall, we have received 4.05" of rain in the last seven days.  With 1.75" of that rain coming in just over an hour yesterday afternoon. 

5 wetlands overflowing
 We are lucky that our course drains very well after a big rain event like this, it just takes a little time.  The worst part about heavy flooding rain events is the damage the water does to our bunkers.  Our crew will be working to repair our 64 bunkers today, and we will all be waiting for the sun to make an appearance again to help dry out the golf course.
bunker repair on #4